Subscribe for updates
Recent Posts
- New Jersey Federal Court Dismisses PFAS Consumer Suit Against Band-Aid on Standing Grounds
- Massachusetts Federal Court Concludes that Biopellets Containing PFAS are “Useful Products,” Providing Defense to Superfund Liability
- District Court Certifies 23(b)(3) Class Action Alleging Injury from Misrepresentations That Pet Food Was “Healthy” Despite Presence of PFAS
- Fifth Circuit Upholds TCEQ’s Third Construction Extension for Texas LNG Project
- Sixth Circuit Holds Clean Air Act Requires Compliance with RACT even where Attainment Application is Pending
Topics
- State Implementation Plans
- Venue
- NJDEP
- Connecticut
- Pollutants
- Federal Land Policy and Management Act
- Council on Environmental Quality
- Agency Action
- Loper Bright
- Public Trust Doctrine
- New Jersey Civil Rights Act
- Environmental Justice
- Disparate Impact
- Title VI
- Massachusetts
- Evidence
- Internal Investigation
- Citizens Suit
- Georgia
- FIFRA
- Federal Insecticide, Fungicide, and Rodenticide Act
- Major Questions Doctrine
- Lead Paint
- Greenwashing
- Good Faith Settlement
- Federal Facilities
- Statutory Notice
- Oil Pollution Act
- Federal Jurisdiction
- Owner Liability
- Court of Federal Claims
- Ripeness
- Renewable Fuel Standard
- Fish and Wildlife Service
- Greenhouse Gas
- Refinery
- Alaska
- Florida
- National Priorities List
- Vapor Intrusion
- Solvents
- Price-Anderson Act
- Solid Waste Management Act
- Personal Jurisdiction
- Successor Liability
- Potentially Responsible Parties
- Operator Liability
- Federal Circuit
- Environmental Covenants
- Apportionment
- National Contingency Plan
- Divisibility
- Water Pollution Control Act
- Strict Liability
- Historic Resources
- Public Utilities Commission
- Utilities
- Hydraulic Fracturing
- Water Use
- PFAS
- Ohio
- Alternative Dispute Resolution
- Arbitration
- Climate Change
- Auer Deference
- Commonwealth Court
- Fees
- West Virginia
- Forest Service
- TSCA
- Martime
- Asbestos
- Gold King Mine
- New Mexico
- Utah
- Tribal Lands
- Federal Tort Claims Act
- Delaware
- Delaware Department of Natural Resources and Environmental Control
- FERC
- National Forest Management Act
- Endangered Species Act
- Chevron Deference
- United States Supreme Court
- HSCA
- Alter Ego
- Corporate Veil
- Allocation
- Eleventh Amendment
- Delaware River Basin Commission
- Mining
- Intervention
- New Hampshire
- Building Materials
- Property Damage
- First Circuit
- PCBs
- Groundwater
- Natural Resource Damages
- Brownfields
- Innocent Party
- Brownfield
- Environmental Rights Amendment
- Pipeline Hazardous Materials Safety Administration
- PHMSA
- Effluents
- FOIA
- Sediment Sites
- EHB
- Texas
- Missouri
- Pipelines
- Injunction
- Coal Ash
- Spoliation
- Stormwater
- TMDL
- Safe Drinking Water Act
- Colorado
- Drinking Water
- Michigan
- North Carolina
- Bankruptcy
- Clean Streams Law
- Hearing Board
- Civil Penalties
- Arranger Liability
- Retroactive
- Sovereign Immunity
- Damages
- Stigma
- Fair Market Value
- Tax assessment
- Property Value
- Storage Tank
- Indemnification
- Energy
- Fifth Circuit
- Electric
- Arizona
- Ninth Circuit
- Attorney-Client
- OPRA
- Iowa
- Fourth Circuit
- Discovery Rule
- Eighth Circuit
- Administrative Appeals
- Taxes
- Preemption
- CAFA
- Natural Gas
- Contamination
- Procedure
- Residential
- Inspection
- Freshwater Wetlands Protect Act
- New York
- Federal Energy Regulatory Commission
- Natural Gas Act
- Pennsylvania Department of Environmental Protection
- Mercury
- D.C. Circuit
- Hazardous Air Pollutants
- HAPs
- Condemnation
- Takings
- Storage
- Flooding
- Takings Clause
- Fifth Amendment
- Causation
- Spill Act
- NEPA
- Interior
- Mineral Leasing Act
- Tenth Circuit
- California
- Zoning
- Act 13
- Insurance Coverage
- Duty to Defend
- Landfill
- Eminent Domain
- Sixth Circuit
- Private Right of Action
- Illinois
- Water
- Subject Matter Jurisdiction
- Citizen Suit
- Diligent Prosecution
- Arkansas
- Pennsylvania
- Press
- Uncategorized
- Maryland
- Eleventh Circuit
- Riverbed
- Navigability
- Montana
- Equal-Footing Doctrine
- Seventh Circuit
- Indiana
- Breach of Contract
- Public Lands
- Bona Fide Prospective Purchaser
- Green House Counsel
- Consent Decree
- Boiler MACT
- EPA
- Enforcement
- Delay Notice
- Equity
- Laches
- CISWI
- Rulemaking
- Contribution
- Second Circuit
- Declaratory Relief
- NPDES
- Standing
- Dimock
- Medical Monitoring
- Legislation
- Case Update
- Dukes
- Louisiana
- Certification
- CLE
- Work Product
- Expert Witness
- Discovery
- Cases to Watch
- Decisions of Note
- Privilege
- Defense Costs
- Insurance
- Consultant Liability
- Negligence
- Remediation
- Response Action Contractors
- Donovan
- Rapanos
- Army Corps
- Odors
- Farming
- Kentucky
- Nuisance
- Hog Barn
- Class Actions
- Trespass
- New Jersey
- Informal Agency Action
- ISRA
- Administrative Hearing
- Cancer
- Air
- Combustion
- Railroad
- Waste
- RCRA
- Emissions
- CERCLA
- Speaking Engagements
- Toxic Torts
- Federal Procedure
- Third Circuit
- Removal
- Statute of Limitations
- Permits
- Clean Air Act
- Title V
- Superfund
- Cost Recovery
- Cleanup
- Supreme Court
- Camp Lejeune
- Tolling
- Statute of Repose
- Multi-District Litigation
- Clean Water Act
- Wetlands
- Administrative Procedures Act
- Enforcement Action
- Marcellus Shale
- Deeds
- Due Process
- Mineral Rights
- Exploration
- Drilling
- Leases
- Oil and Gas
- Royalties
- Real Estate
Blog editor
Blog Contributors
Showing 3 posts in Missouri.
On September 27, 2024, in Short Creek Development, LLC v. MFA Incorporated, No. 22-05021-CV-SW-WBG, 2024 WL 4326815 (W.D. Mo. Sept. 27, 2024), Magistrate Judge W. Brian Gaddy determined Plaintiffs’ claim under Section 107(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (“CERCLA”) was barred by the applicable statute of limitations as “physical on-site construction of the remedial action” occurred more than six years prior to when Plaintiffs brought their lawsuit. Specifically, the Magistrate Judge found that costs related to a leachate collection system constructed approximately a year before the adoption of a Record of Decision (“ROD”) amendment outlining a permanent remedy for the Orongo-Duenweg Mining Belt Superfund Site (the “Site”) was the beginning of the six-year limitations period. In doing so, the Court rejected adoption of a “bright-line” rule that remedial actions begun before adoption of a final remedial plan do not trigger the limitations period. Read More »
On May 18, 2022 in York et al. v. Northrop Grumman Corp. Guidance and Electronics Co. Inc. et al., No. 21-cv-03251 (W.D. Mo.), a Missouri federal court dismissed Plaintiffs’ complaint alleging negligence, nuisance and trespass from alleged groundwater contamination, finding the claims were preempted by an existing consent decree. Read More »
Last week, the United States Court of Appeals for the Eighth Circuit affirmed a district court’s ruling to decertify a class action filed by landowners for releases from Exxon’s 850-mile Pegasus Pipeline that crosses four states from Texas to Illinois. The case, Webb, et al. v. Exxon Mobil Corp., et al., Dkt. No. 15-2879 (8th Cir., May 11, 2017), was filed by a group of landowners who claimed that Exxon materially breached the terms of their right-of-way easement agreements by allegedly failing to inspect, maintain, repair, and replace the pipeline, which was originally installed in the mid-1940s. At various times since the 1980s, the pipeline had releases in Texas, Arkansas, and Missouri, which the plaintiffs claim resulted in damage to their properties. The plaintiffs sought to rescind their right-of-way easement agreements and force Exxon to remove or replace the entire pipeline, or in the alternative, to be paid damages for breach of contract and diminution in property value. Read More »
