Subscribe for updates
Recent Posts
- Wisconsin District Court Allocates CERCLA Liability for Past and Future Response Costs
- Missouri Court Rejects "Bright-Line" Test for Determining Statute of Limitations Under CERCLA Section 107
- Louisiana Trial Court Enjoins EPA From Enforcement of Disparate Impact Regulations Under Title VI
- D.C. Circuit Continues to Afford Deference to Technical Agency Decisions
- SCOTUS to Resolve Scope of Agency NEPA Environmental Analysis
Topics
- Disparate Impact
- Environmental Justice
- Title VI
- Massachusetts
- Evidence
- Internal Investigation
- Citizens Suit
- Georgia
- Federal Insecticide, Fungicide, and Rodenticide Act
- FIFRA
- Major Questions Doctrine
- Lead Paint
- Greenwashing
- Good Faith Settlement
- Federal Facilities
- Statutory Notice
- Oil Pollution Act
- Federal Jurisdiction
- Owner Liability
- Court of Federal Claims
- Ripeness
- Renewable Fuel Standard
- Fish and Wildlife Service
- Greenhouse Gas
- Refinery
- Alaska
- Florida
- Vapor Intrusion
- Solvents
- National Priorities List
- Price-Anderson Act
- Solid Waste Management Act
- Personal Jurisdiction
- Successor Liability
- Potentially Responsible Parties
- Operator Liability
- Environmental Covenants
- Federal Circuit
- National Contingency Plan
- Divisibility
- Apportionment
- Strict Liability
- Water Pollution Control Act
- Public Utilities Commission
- Historic Resources
- Utilities
- Hydraulic Fracturing
- Water Use
- Ohio
- PFAS
- Arbitration
- Alternative Dispute Resolution
- Climate Change
- Auer Deference
- Commonwealth Court
- Fees
- West Virginia
- Forest Service
- TSCA
- Asbestos
- Martime
- Federal Tort Claims Act
- Gold King Mine
- New Mexico
- Utah
- Tribal Lands
- Delaware
- Delaware Department of Natural Resources and Environmental Control
- National Forest Management Act
- FERC
- Chevron Deference
- United States Supreme Court
- Endangered Species Act
- HSCA
- Corporate Veil
- Alter Ego
- Allocation
- Eleventh Amendment
- Delaware River Basin Commission
- Mining
- Intervention
- New Hampshire
- PCBs
- Property Damage
- Building Materials
- First Circuit
- Groundwater
- Natural Resource Damages
- Innocent Party
- Brownfields
- Brownfield
- Environmental Rights Amendment
- Pipeline Hazardous Materials Safety Administration
- PHMSA
- FOIA
- Effluents
- Sediment Sites
- EHB
- Pipelines
- Texas
- Missouri
- Injunction
- Coal Ash
- Spoliation
- Stormwater
- TMDL
- Safe Drinking Water Act
- Colorado
- Michigan
- Drinking Water
- North Carolina
- Bankruptcy
- Clean Streams Law
- Hearing Board
- Civil Penalties
- Arranger Liability
- Sovereign Immunity
- Retroactive
- Fair Market Value
- Damages
- Stigma
- Property Value
- Tax assessment
- Storage Tank
- Fifth Circuit
- Indemnification
- Electric
- Energy
- Arizona
- Ninth Circuit
- Attorney-Client
- OPRA
- Iowa
- Fourth Circuit
- Discovery Rule
- Eighth Circuit
- Administrative Appeals
- Taxes
- Preemption
- CAFA
- Freshwater Wetlands Protect Act
- Inspection
- Residential
- New York
- Federal Energy Regulatory Commission
- Natural Gas Act
- Pennsylvania Department of Environmental Protection
- Mercury
- D.C. Circuit
- HAPs
- Hazardous Air Pollutants
- Condemnation
- Takings
- Natural Gas
- Storage
- Fifth Amendment
- Flooding
- Takings Clause
- Causation
- Spill Act
- NEPA
- Interior
- Tenth Circuit
- Mineral Leasing Act
- California
- Zoning
- Act 13
- Duty to Defend
- Insurance Coverage
- Eminent Domain
- Landfill
- Private Right of Action
- Sixth Circuit
- Illinois
- Water
- Citizen Suit
- Diligent Prosecution
- Subject Matter Jurisdiction
- Arkansas
- Pennsylvania
- Press
- Uncategorized
- Maryland
- Eleventh Circuit
- Equal-Footing Doctrine
- Montana
- Navigability
- Riverbed
- Indiana
- Seventh Circuit
- Breach of Contract
- Public Lands
- Bona Fide Prospective Purchaser
- Green House Counsel
- Consent Decree
- Rulemaking
- CISWI
- Enforcement
- Equity
- Laches
- Delay Notice
- EPA
- Boiler MACT
- Second Circuit
- Contribution
- Declaratory Relief
- NPDES
- Procedure
- Standing
- Dimock
- Medical Monitoring
- Case Update
- Legislation
- Dukes
- Louisiana
- Certification
- Contamination
- CLE
- Cases to Watch
- Discovery
- Expert Witness
- Privilege
- Work Product
- Decisions of Note
- CERCLA
- Cost Recovery
- Defense Costs
- Insurance
- Real Estate
- Negligence
- Remediation
- Response Action Contractors
- Consultant Liability
- Donovan
- Rapanos
- Army Corps
- Trespass
- Farming
- Hog Barn
- Kentucky
- Nuisance
- Class Actions
- Odors
- Informal Agency Action
- Administrative Hearing
- New Jersey
- ISRA
- Cancer
- Combustion
- Emissions
- Railroad
- RCRA
- Waste
- Air
- Speaking Engagements
- Third Circuit
- Toxic Torts
- Federal Procedure
- Removal
- Clean Air Act
- Permits
- Statute of Limitations
- Title V
- Cleanup
- Superfund
- Supreme Court
- Multi-District Litigation
- Statute of Repose
- Tolling
- Camp Lejeune
- Wetlands
- Administrative Procedures Act
- Deeds
- Clean Water Act
- Marcellus Shale
- Mineral Rights
- Due Process
- Enforcement Action
- Oil and Gas
- Royalties
- Drilling
- Exploration
- Leases
Blog editor
Blog Contributors
Showing 2 posts from May 2017.
Last week, the Second Circuit issued an unpublished decision affirming an earlier decision of the Eastern District of New York that stands for the principle that a passive lessee that subleases a property to an unaffiliated tenant is neither an “Owner” nor an “Operator” under CERCLA. Next Millenium Realty, LLC v. Adchem Corp., No. 16-1260-cv, 2017 U.S. App. LEXIS 8476 (2d Cir. May 11, 2017). Read More »
Last week, the United States Court of Appeals for the Eighth Circuit affirmed a district court’s ruling to decertify a class action filed by landowners for releases from Exxon’s 850-mile Pegasus Pipeline that crosses four states from Texas to Illinois. The case, Webb, et al. v. Exxon Mobil Corp., et al., Dkt. No. 15-2879 (8th Cir., May 11, 2017), was filed by a group of landowners who claimed that Exxon materially breached the terms of their right-of-way easement agreements by allegedly failing to inspect, maintain, repair, and replace the pipeline, which was originally installed in the mid-1940s. At various times since the 1980s, the pipeline had releases in Texas, Arkansas, and Missouri, which the plaintiffs claim resulted in damage to their properties. The plaintiffs sought to rescind their right-of-way easement agreements and force Exxon to remove or replace the entire pipeline, or in the alternative, to be paid damages for breach of contract and diminution in property value. Read More »